94911 Rostock Port, Renewal Berth 5 - Oil Port
Project description:
- 230 m tanker berth for the transshipment of mineral oil and chemical products;
- Demolition of the existing mooring posts landing pier;
- New building of 8 mooring posts, 2 land-sided abutements and footbridges up to 33 m clear span;
- Installation of 600 kN bollards, cable winch, twofold and threefold panik hook, illumination;
- Installation of the technical equipment within the ex-zone area.
Project Location:
Rostock, Meckenburg-Western Pomerania
Services:
Local Supervision, Structural Planning
Time: 2011–2012
Client:
Rostock, Meckenburg-Western Pomerania