Power Connection Solar Park Jabel
Project description:
- Line Planning, 20 kV power cord from the solar park to the conjunction with the public electricity grid;
- 8.1 km power cord for the solar park (24 ha, peak output 17.34 MWp);
- Cable laying on public and private field parts.
- Design: 4.9 km cable burying plough;
1.3 km exposed cable trench;
1.9 km controlled pipe jacking up to 300 m single length of a drilling.
Project Location:
Jabel, Mecklenburg-Western Pomerania
Services:
Draft Planning, Approval Planning, Implementation Planning
Time: 2011
Client:
juwi Solar LLC
Office Brandis
Am Alten Flugplatz 1
04821 Brandis