Network connection system OWP Gennaker
Project description:
- 109 km of AC submarine cable with joints between the mainland and a wind farm;
- Crossing structures for cables and lines;
- Cable installation by flushing, milling, ploughing and dredging.
Project Location:
Baltic Sea between mainland and a wind farm
Services:
Object planning Routing
Time: 2023–2025
Client:
50Hertz Transmission GmbH
ARGE Trassierung Seetrasse OST-1-4