Network connection system OWP Gennaker

Project description:

  • 109 km of AC submarine cable with joints between the mainland and a wind farm;
  • Crossing structures for cables and lines;
  • Cable installation by flushing, milling, ploughing and dredging.

Project Location:
Baltic Sea between mainland and a wind farm

Services:
Object planning Routing

Time: 2023–2025

Client:

50Hertz Transmission GmbH

ARGE Trassierung Seetrasse OST-1-4